Gariahat Flyover

 

The Gariahat Flyover project was completed in 30 months and is open to traffic in Kolkata. The 571.06-metre long flyover, the foundation stone of which was laid in 1999, is part of the four flyover projects, under the Rs 400-crore Calcutta Transport Infrastructure Development Projects. The Japanese Bank for International Co-operation is funding the project.

 

Carries 4 General purpose lanes
Crosses Gariahat Crossing
Longest span 571.06 Mts
Total length 571.06 Mts
Width 18 metres (60 ft)
Clearance below 26 metres (85 ft)
Opening date 14th April, 2002
     

 